Problems of Designing the Organization of Hydraulic Construction and its Need for Solutions

Authors

  • Dildora Bahodirovna Salimova Tashkent Institute of Irrigation and Agricultural Mechanization Engineers “Institute of Natural Resources Management of the National Higher University of Bukhara” 1st degree doctoral student

Keywords:

hydraulic engineering construction, construction and installation works, Construction Organization Project, detailed designs developed during the construction stage

Abstract

this article discusses the current problems of organizing hydraulic engineering construction and their significance, as well as what and in what order needs to be built in accordance with the “Construction Organization Project” (COP) and detailed designs developed during construction. Stage (DDC) refers to the design associated with what technology to use, in what time frame and with what resources.

Downloads

Published

2024-01-07

How to Cite

Problems of Designing the Organization of Hydraulic Construction and its Need for Solutions. (2024). American Journal of Engineering , Mechanics and Architecture (2993-2637), 2(1), 1-7. https://www.grnjournal.us/index.php/AJEMA/article/view/2499